Clarissa Reyes, UCCE Orchards Advisor, Sutter-Yuba, Butte & Placer counties
Walnut leaf-out has begun a little earlier than usual with temperatures coming in hot at the start of spring. As growers plan when to begin irrigating their orchards, they should consider the rainfall we’ve received over the winter as a factor in this decision. At the time of writing this, Verona CIMIS station in Sutter county has reported 16.3” precipitation from Dec 1, 2025 – Mar 23, 2026 (last year was 10.1” for the same date range). This amount of rainfall should be considered a reserve of water that growers can use to delay the start of irrigation for some time after leaf-out in walnut.
Among the major tree crops grown in the Sacramento Valley, walnut is especially sensitive to overwatering. During the spring, trees have a period of new fine root growth, which are responsible for most nutrient and substantial water uptake. Too much soil water early in the spring can suppress this root growth, which will then impact water and nutrient uptake potential during the hottest and driest weeks of summer, and potentially cause tip burn, leaf damage, and dark kernels.
Prior research by the University of California has shown that vegetative tree growth and production in walnut is favored when irrigation is managed to sustain low levels of tree stress. The most effective method to ensure that trees experience a low level of tree stress is to determine plant-water status with a pressure chamber by measuring stem water potential (SWP). SWP measurements taken at mid-day are compared to a “baseline” value, and the recommended time to irrigate is not your walnut trees are 2-3 bars more negative than the baseline. SacValleyOrchards.com now has an online tool that can help easily calculate the difference between your SWP and baseline, or you can also print the pdf tables to use in the field.
A new research project in walnut was started in 2025 by the Shackel Lab at UC Davis, with collaborators throughout the state. The project covers ten sites between Tehama to Stanislaus counties and examines the effects of holding off irrigation until the trees reach a SWP of 2 bars below baseline. Each week from April through November SWP from five trees at each site will be measured using the pressure bomb, and irrigation will not be initiated in those fields until trees have reached 2 bars below baseline.
This approach of measuring plant-water status uniquely integrates and quantifies how an orchard responds to its unique soil, water, and environmental conditions. Irrigating based on SWP can ensure that trees have adequate oxygen for root growth and nutrient transfer, prevent detrimental leaf symptoms (yellowing, collapsing canopy) of overwatering, and reduce risk of tree loss. Over the past few years, a grower in Sutter county using stem water potential for irrigation management has been able to push their first irrigation of the season out past April – from early May in a drought year, up to early June after a wet winter. This timing not only helps tree health and longevity but also results in cost-savings as pump and energy use is delayed.
If you do not own a pressure chamber, your PCA may be able to add this service. More information about irrigation management using a pressure chamber and other methods can be found in UC ANR Publication 8503: Using the Pressure Chamber for Irrigation Management in Walnut, Almond and Prune and in our Stem Water Potential series of blog posts on SacValleyOrchards.com

Leave a Reply